Chic Dresses, Elegant Shoes, Stylish Jackets & Casual Footwear
Chic Dresses, Elegant Shoes, Stylish Jackets & Casual Footwear Chic Dresses, Elegant Shoes, Stylish Jackets & Casual Footwear
Home Dresses Bodycon Dresses
Florals Bodycon Bandage Long Dress

Florals Bodycon Bandage Long Dress

$ 28.56

$ 0.00

Save: $

Color:
  • Pink
Size:
  • XS
  • L
  • S
  • M
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

 

Elasticity: Medium Stretch

Sleeve Style: regular

Fabric Type: POLYESTER

Pattern Type: Solid

Fit Type: Slim

Silhouette: Sheath

Neckline: O-Neck

Decoration: Appliques

Style: Sexy & Club

Dresses Length: Ankle-Length

Material: POLYESTER

Material: Rayon

Material: SPANDEX

Age: JUNIOR

Season: All season

Closure Type: zipper

Type: regular

Material Composition: synthetic fiber

Waistline: Natural

Sleeve Length(cm): Full

Craft of Weaving: Knit

Release Date: Autumn 2024

Profile Type: X

Gender: WOMEN

You May Also Like

KINGS PLATE DEGREE FRONT OR HIND SHOES
KINGS PLATE DEGREE FRONT OR HIND SHOES

$ 11.28

Save: $

Red Embroidered Patola Silk Wedding Saree
Red Embroidered Patola Silk Wedding Saree

$ 40.33

Save: $

Matching Outfits Long Sleeve Plaid  For Mother And Daughter
Matching Outfits Long Sleeve Plaid For Mother And Daughter

$ 22.26

Save: $

Aradia Black Vinyl Trench
Aradia Black Vinyl Trench

$ 36.80

Save: $

Embellished Wedge Heels
Embellished Wedge Heels

$ 34.04

Save: $

Girl in Mind Luna Sequin Top Bodycon Dress | Wine
Girl in Mind Luna Sequin Top Bodycon Dress | Wine

$ 29.97

Save: $

Khaite Maxwell Trench Coat
Khaite Maxwell Trench Coat

$ 33.25

Save: $

Patagonia - Down Sweater
Patagonia - Down Sweater

$ 109.20

Save: $

Plum Sparkly Long Sleeve Ruched Midi Bodycon Dress
Plum Sparkly Long Sleeve Ruched Midi Bodycon Dress

$ 19.20

Save: $

HARRI - BLACK COMO
HARRI - BLACK COMO

$ 59.97

Save: $

Cart
Chic Dresses, Elegant Shoes, Stylish Jackets & Casual Footwear
Your cart is currently empty.